• 150kV/10kV-Hybrid Power Equipment
• Ukrainian Industrial Center
Due to geopolitical conflicts, a key substation in a major industrial center of Ukraine, located in a specific region, suffered severe damage. This caused power outages to surrounding metallurgical plants (strategic material production) and left 150,000 residents without electricity. In response to an urgent request from the Ukrainian National Energy Company and local distribution operators, KeRun Intelligent Control Co., Ltd. customized and delivered hybrid power equipment compatible with both Soviet-era 150kV standards and modern EU IEC standards. This equipment became the core power source for the region’s “Winter Power Supply Campaign.”
KeRun delivered hybrid power equipment for Ukraine’s emergency power grid recovery, ensuring reliable winter power supply in conflict zones.