Kerun Intelec builds power transformers through an intelligent manufacturing system integrating precision processing, digital process control, automated production, and full quality traceability. From core cutting and winding to assembly, oil treatment, and final testing, every stage is engineered to deliver reliable performance for global power infrastructure.
Compact Substation Production Line
Automated CNC laser cutting and press braking form precision panels and frames; robotic MIG/TIG welding produces continuous, distortion-controlled seams.structural rigidity, and repeatable assembly.
Integrated Assembly Equipment
Dedicated assembly lines for transformer, switchgear, and low-voltage panels.
Modular enclosure fabrication and fitting systems.
Precision busbar processing and cable connection tools.
Enclosure & System Integration
Customized compact layout supports efficient space utilization.
Metal enclosure cutting, bending, welding, and surface treatment ensure durability.
Integrated design improves installation convenience and on-site reliability.
Electrical Assembly & Control
Standardized wiring, grounding, and interlocking procedures.
Coordinated assembly of HV units, transformer section, LV distribution units, and control devices.
Clear internal routing improves safety, maintenance, and operation efficiency.
Testing & Delivery Assurance
Mechanical inspection for enclosure structure, doors, locks, and ventilation.
Electrical tests cover insulation, grounding continuity, functional operation, and protection performance.
Final system verification ensures ready-to-use delivery for power distribution applications.
The Beginning of Everything-RAW MATERIAL
Raw materials and components sourced from our own factory or verified reputable vendors (e.g., MR, ABB, Huaming, GE)
Enclosure Manufacturing
Raw materials and components sourced from our own factory or verified reputable vendors (e.g., MR, ABB, Huaming, GE)
01
Sheet-Metal Fabrication
Automated CNC laser cutting and press braking form precision panels and frames; robotic MIG/TIG welding produces continuous, distortion-controlled seams.structural rigidity, and repeatable assembly.
02
Surface Treatment
After abrasive blasting establishes a clean, uniform surface profile, Electrostatic powder coating with controlled film build is oven-cured to deliver durable corrosion resistance aligned with the specified environment class.
03
Compartment Pre-assembly
MV, transformer, LV, and auxiliary compartments are pre-fitted to the approved layout. gland plates,and cable sealing modules are installed etc to meet target IP/IK performance and simplify downstream integration.
Pre-Assembled Equipment
01/03
MV Switchgear Unit
Transformer Unit
LV Switchgear Unit
MV Switchgear Unit: Production & Testing, Ready-to-Install RMU/GIS is configured and verified for dielectric strength, contact resistance, and mechanical/electrical interlocks.
Oil-immersed or cast-resin transformers undergo routine tests—ratio, winding resistance, insulation, applied/induced voltage, and (for dry-type) partial discharge ensuring reliable service performance.
Incoming and outgoing feeders, busbars, and protection devices are assembled, braced, and function-tested.ensure safe, ready-to-install sections.
Final Assembly & Integration
Installation of Pre-assembled Modules
Pre-built MV, transformer, LV, and auxiliary units are positioned, leveled, and fixed with vibration isolation; clearances and maintenance access are confirmed against the layout.
Primary Connections (MV-TR-LV)
Interconnections use insulated busbar, flexible links, or cables as designed; joints are torqued to specification, short-circuit braced, phase/ID marked, and verified for mechanical strength.
Secondary Integration
Protection, control, metering, interlocks, and communications are wired end-to-end; device settings and addresses are loaded and checked for reliable system behavior.
Testing
Testing Lab
Mechanical integrity, sealing (IP), insulation/dielectric, interlocks, protection secondary injection, and SCADA I/O are executed with recorded results, confirming compliance and commissioning readiness.